Assistant to the head of the engineering maintenance department (Samir Abbas Ali) explained to al-Kafeel Network the total work of this project, saying: "The project, which involved all the divisions of the Department of Engineering Maintenance (Division of Art Crafts, Construction Division, Division of Cooling, Electricity Division), is built on the total area (825.5 square meters), consisting of (16) halls (6) classrooms, a management office, another office for the teachers, a sanitary center, a shop, a store, a nursery, a banquet hall and an information center caravan. The specialized staff started installing the iron structure of the school and other works of construction using "sandwich panel"."
He added: "The school is composed of a single floor on an area of 5250 square meters, and includes integrated services designed and implemented efficiently and with high quality, in addition to the operating systems of electricity according to special specifications and mechanical systems of cooling system according to modern specifications."
It is to note that the project, which is carried out under the direct supervision of the engineering maintenance department at the al-Abbas's (p) holy shrine, reached a completion rate of about (88%), and work continues until the full completion of the project.